Power shut down

Excelsior Correspondent

JAMMU, June 7: In order to carry out work for the erection of poles and stringing of 33 KV line conductor for shifting of load from Janipur Grid to Barn Grid, the shutdown of 33 KV Barn Bhalwal-Thathar-Bantalab line is being observed.
During the shutdown, the power supply to Nardni, Raipur, MES, Radio Station, CRPF, PHE, Local Batal, Telephone Exchange, Aux. Hospital, Bantalab will remain affected on June 9 and 10 from 6 am to 11 am.