Excelsior Correspondent
JAMMU, Nov 12: Giving a push to infrastructural developmental in Jammu West Assembly Segment, BJP State president and MLA, Sat Sharma (CA) started macadamization works at Pacca Talab area of Ward 17. The works started will cover the main stretch of Pacca Talab road up to New Plot area and it also includes internal roads as well. A large number of people including officials of PWD, local residents and political activists were also present on the occasion.
The works will be constructed under the supervision of PWD (R&B) at an estimated cost of Rs 40 lakh and a stretch of around whole area will be covered under the same.
Speaking on the occasion, Sat Sharma congratulated the residents and political activists of the area and stated that BJP is committed to provide best possible infra to the masses and the quality of the works done states that there is no compromise on the quality of the works done by various departments in Jammu West Assembly Segment.
He said the roads which are being macadamized under his tenure were never black topped from decades and their condition became worst and ultimately caused miseries for the local residents and the people who travel and walk through these roads. He said within a stipulated period of time these works will be completed so that no problems are faced by the locals.
He stated that major projects including installation of sewerage system and water pipes are almost completed and these areas are now kept on priority. The works for restoration of roads and lanes in these areas are already in progress and many areas have been restored as well.
Sat also appealed to the masses to maintain the sanctity of the works done and urged them to promote and contribute in the noble cause of “Swachhta Hi Seva” in which the Prime Minister, Narendra Modi has asked everyone to spare some time for cleaning of their surroundings so that PM’s dream of Clean and Green Nation could be achieved.