7 illegal power lines disconnected

Excelsior Correspondent
NOWSHERA, July 2: On the directions of Executive Engineer Electric Division Rajouri, JPDCL and under the supervision of AEE Electric Sub-division Nowshera, JPDCL  inspections were conducted by Feeder Manager, Meter readers and line staff in Nowshera town.
Total 32 inspections were conducted and seven (7) illegal service lines were disconnected on the spot. 31 KW of load was revised on the spot. AEE Electric Sub-division Nowshera JPDCL, appealed to the public for judicious use of power in the summer months and pay timely dues for quality power supply to the consumers.