Baru assures early completion of deep drain at Hazuribag

Excelsior Correspondent
JAMMU, Jan 1: BJP senior leader and JMC Councilor, Jammu Municipal Corporation, (JMC) Sanjay Kumar Baru assured the residents of Hazuribag and Bohri in Ward Number 41 of Talab Tillo for the early completion of ongoing deep drain construction from Bohri Chowk to KC Hazuribag.
Taking immediate note of the problems of the people Sanjay Baru today toured the area. He was approached by the local residents of the area, who are facing various problems due to the ongoing construction of deep drain at Main Hazuribag road.
While interacting with the local residents, Baru said that all the raised issues will be resolved to the satisfaction of the local residents for once with the proper solution and it is expected that very soon construction work of deep drain will be completed.
Baru added that nation excelled a lot under the leadership of Prime Minister, Narendra Modi and works done under NDA Government in the last years also provided manifold increase in development projects of Jammu and Kashmir as well. He said that as the ground level BJP activist and a responsible public representative he is keen to take development to the doorsteps of the residents while meeting their expectations.
Earlier, residents of Hazuribag Bohri gathered near Anchar Factory Hazuribag to discuss their grievances. After the assurance given by Baru, they were satisfied and dispersed peacefully.
On the occasion, Sanjay Kumar Baru also inspected the deep drain cum irrigation channel at Hazuribag, Bohri for the required desilting work.