Excelsior Correspondent
JAMMU, Jan 16: To carry out the work of replacement of old pole DBs with the modified ones and their associated works, the power supply to Dhounthly, Manda, Ambphalla, Karan Nagar and adjoining areas fed from D-4 (LT Network) feeder will remain affected from January 16 to January 31 (Except Holidays) from 10 am to 3 pm (on alternate DTs).
Similarly, the power supply to Tawi Vihar, Sidhra and adjoining areas fed from Sidhra-2 (LT Network) feeder will remain affected from January 16 to January 31 (Except Holidays) from 10 am to 3 pm (on alternate DTs).
Likewise, the power supply to Denis Gate, Prem Nagar, Christian Colony, Upper Gummat and Lower Gummat fed from DG-2 (LT Network) feeder will remain affected from January 16 to January 31 (Except Holidays) from 10 am to 3 pm (on alternate DTs).
Similarly, the power supply to Denis Gate, Prem Nagar, Christian Colony, Upper Gummat and Lower Gummat, Early Times and adjoining areas fed from DG-4 (LT Network) feeder will remain affected from January 16 to January 31 (Except Holidays) from 10 am to 3 pm (on alternate DTs).
However, to carry out the R-APDRP works, the power supply to Lakkad Mandi, Janipur and adjacent areas fed from J-2 LT Network will remain affected from January 16 to January 31 from 9 am to 5 pm (Power block on alternate DTs).
Similarly, the power supply to Janipur Colony, Lakkad Mandi and adjoining areas fed from J-3 LT Network will remain affected from January 16 to January 31 from 9 am to 5 pm (Power block on alternate DTs).