Power shut down

Excelsior Correspondent
JAMMU Mar 25: As per Superintending Engineer, Elect. Maintt. & R.E. Circle-1, Jammu, to execute work for installation of HT/LT poles by M/s. L&T, the shutdown of 11KV, B-2 feeder at Bohri R/Stn is being observed.
During the shutdown, the power supply to Bohri and its adjoining areas will remain affected on March 26, 28 and 31 from 09 am to 02 pm.