Power shut down

Excelsior Correspondent

JAMMU,  Nov 17: In order to carry out the work of dismantling old tower at location No.104 and stringing of ACSR Panther Conductor on newly erected tower at location No.104, the shut down of 132 KV D/C Rajouri-Draba Trans-mission line is being observed on November 20 from 9 AM to 5 PM.
As intimated by the Chief Engineer, S&O Wing Jammu, during the shutdown period the power supply to District Poonch will remain affected.