Power shut down

Excelsior Correspondent
JAMMU, May 9: In order to carry out the immediate repairs for removing the weak points in 132KV Barn-Katra transmission line, the shut down of 132KV Barn-Katra transmission line on 11-05-2012 from 0800 hrs to 14.00   hrs has been allowed.
As intimated by Chief Engineer, S&O Wing Jammu the power will be supplied to the affected areas from Jhajjar Kotli Grid Station.